Case Studies

WIN-911 Case Study – Comox Valley Regional District
Located on Vancouver Island, British Columbia, Canada, the Comox Valley is home to 75,000 people. The townships of Comox, Courtenay

WIN-911 Case Study – Renewable Water Resources
For almost 100 years, Renewable Water Resources (ReWa) has been responsible for the county’s wastewater infrastructure, and manages eight water

WIN-911 Case Study – Seneca Resources
The United States is the world’s largest producer of natural gas. Production levels in 2020 were approximately 33.5 trillion cubic

WIN-911 Case Study – City of Granbury, Texas
The City of Granbury, TX., is approximately an hour drive southwest of Dallas. The man-made Lake Granbury runs through the

WIN-911 Case Study – Quasar Energy Group
Quasar’s Ohio facilities in Cleveland, Zanesville, and Wooster are monitored around the clock by Rockwell Automation’s FactoryTalk® SCADA system, which

WIN-911 Case Study – Threemile Canyon Farms
Threemile Canyon Farms’ intricate irrigation system and pump stations depend on advanced technology to help guarantee healthy crops and high

WIN-911 Case Study – Night Hawk Frozen Foods
Greater Austin, TX-based Night Hawk Frozen Foods has been expanding to meet the rise in demand for frozen products. WIN-911

WIN-911 Case Study – Grand Forks Regional Water Treatment Plant
Monitoring at the previous 60-year-old water treatment plant depended on operators in a control room 24/7 to manually acknowledge alarms

WIN-911 Case Study – Shanghai Hongqiao International Airport
Power requirements for this state-of-the-art transportation hub are immense. To ensure safe, continuous operation, the Shanghai Airport Authority uses an